The Challenge
This project posed specific challenges:
- Strict Scheduling: The delivery had to align with the designated loading bay time slot at Burlington House, requiring precise timing.
- Valuable and Fragile Items: The artwork, though self-packed by the client in custom protective sleeves, required careful handling throughout the move.
- Exhibition Setup: The artwork needed to be delivered directly to the gallery’s stand within the Royal Academy’s exhibition space, ensuring everything was ready for display.









